Enrogen designed, installed, and commissioned 3 x 600kVA Diesel Generators, Switchboard & Permanent Loadbank at a Northern Hospital in 2021.
The Enrogen generator sets were built with MTU 12V1600G20F engines coupled to Leroy Somer LSA49.3S4 alternators with acoustic attenuation rated at 70dBA @ 1mtr.
We built with ComAp controls for set to set synchronising with n+1 configuration.
The Enrogen built Essential switchboard was designed to fit within the plantroom with the generators. A temporary switchboard was used during the cable migration so the hospital could continue operation whilst keeping shut-downs to a minimum, this was done out of normal working hours.
The fuel system was designed and arranged for 72hrs running with a recirculating system from the Enrogen built underbase 10hr day tanks back to the bulk tank for fuel polishing.
A ASCO (Froment) Permanent Loadbank was supplied so the generators can be tested individually or synchronised together.